SEI ELECTRIC COMPONENTS

SEI ELECTRIC COMPONENTS

The project of supplying and installing the cooling tower system for the expanded SEI Electric factory at Thang Long Industrial Park in Hanoi is not only a construction contract but also a testament to FANSIPAN GROUP’s commitment to providing optimal and sustainable technical solutions for the industry. The project began with close cooperation with the engineering and design team of SEI Electric to fully understand the specific needs and production requirements of the factory. We conducted in-depth analyses of thermal load and required capacity, from which we selected the most suitable cooling tower to optimize performance across the entire production system.

Supplying and Installing the Cooling Tower System

FANSIPAN supplied and installed the cooling tower system with appropriate capacity to meet the cooling needs of equipment and production lines in the SEI Electric factory. This cooling tower system was specially designed to reduce the temperature of water in the cooling system, ensuring a stable temperature supply for the equipment, thereby enabling the machinery to operate at high efficiency and minimizing the risk of damage due to overheating. Every component of the cooling tower was meticulously selected and installed to ensure optimal cooling performance and long-lasting durability for the system.

Emphasis on Efficiency and Energy Savings

Throughout the design and installation process, FANSIPAN focused on optimizing the energy performance of the cooling tower system. The selected equipment was chosen for its energy-saving capabilities, minimizing operating costs, and protecting the environment. The cooling towers from FANSIPAN not only provide powerful cooling but also reduce electricity consumption, contributing to enhanced sustainability in the production activities of SEI Electric.

The cooling tower installation project for SEI Electric is not only a technical success but also the beginning of a strong and lasting partnership between FANSIPAN GROUP and SEI Electric. We are committed to accompanying the client in the next steps, from maintenance to future expansion projects.

With relentless effort and a commitment to quality, FANSIPAN GROUP proudly asserts its position in the industrial construction and equipment installation sector, contributing to the sustainable development of partners and the local economy. We aim to mark a new milestone in providing technological solutions that bring tangible value to the community and society.

WordPress database error: [You have an error in your SQL syntax; check the manual that corresponds to your MariaDB server version for the right syntax to use near ') ORDER by p1.ID DESC LIMIT 2 )...' at line 17]
( SELECT p1.post_title, p1.post_date, p1.ID, p1.post_content, p1.post_name FROM wp_posts p1 LEFT JOIN wp_term_relationships ON (p1.ID = wp_term_relationships.object_id) LEFT JOIN wp_term_taxonomy ON (wp_term_relationships.term_taxonomy_id = wp_term_taxonomy.term_taxonomy_id) WHERE p1.ID < '626' AND p1.post_type = 'du-an' AND p1.post_status = 'publish' AND wp_term_taxonomy.taxonomy = 'danh-sach-du-an' AND wp_term_taxonomy.term_id IN() ORDER by p1.ID DESC LIMIT 2 ) UNION ( SELECT p2.post_title, p2.post_date, p2.ID, p2.post_content, p2.post_name FROM wp_posts p2 LEFT JOIN wp_term_relationships ON (p2.ID = wp_term_relationships.object_id) LEFT JOIN wp_term_taxonomy ON (wp_term_relationships.term_taxonomy_id = wp_term_taxonomy.term_taxonomy_id) WHERE p2.ID > '626' AND p2.post_type = 'du-an' AND p2.post_status = 'publish' AND wp_term_taxonomy.taxonomy = 'danh-sach-du-an' AND wp_term_taxonomy.term_id IN() ORDER by p2.ID ASC LIMIT 2 ) ORDER by post_date ASC

CLIENTS AND PARTNERS